项目名称:Huangshan District Domestic Waste Landfill Leachate Treatment Station
项目地点:Xingcun Village, Gantang Town, Huangshan District, Huangshan City, Anhui Province
运营模式:Trusteeship and operation of leachate treatment station
工艺、设备情况:Regulating tank + pretreatment + two-stage A/O + MBR + nanofiltration (NF) + reverse osmosis (RO)
The leachate produced in the reservoir area is intercepted by the garbage dam and transported by the pipeline to the adjustment tank of the leachate station. The leachate treatment capacity is 100 tons per day, and the water produced is 70 tons per day; the system recovery rate is 70%. After the leachate is treated, the effluent meets the discharge standard in Table 2 of the "Pollution Control Standard for Domestic Waste Landfill Site" (GB16889-s2008). After the leachate treatment reaches the standard, it is discharged into the nearby water body after online monitoring。