Yunyang Chadian Town Changling Road Landfill Project treated 36 tons of leachate and produced 26 tons of water every day. The quality of the produced water met the discharge standard of Table 2 of Domestic Waste Landfill Pollution Control Standard (GB16889-2008). After the treatment of leachate reaches the standard, it is discharged after on-line monitoring.