Lianyungang Fishing Mountain Project

Lianyungang Fishing Mountain Project

Entry name:Leachate Treatment Station of Lianyungang Municipal Solid Waste Landfill

Project location:Lianyungang Haizhou District Shisong Highway Domestic Garbage Landfill

Operation mode:Equipment procurement (including operation services)

Technology:Preprocessing + two-stage DTRO


  • Case description

The landfill site has been sealed, and the landfill leachate stored in the reservoir area is mainly treated. The daily inflow of this equipment is 55 cubic meters, and the water production is 37 cubic meters. The system recovery rate is controlled at about 70%, and the water production meets the discharge standard in Table 2 of Domestic Waste Landfill Pollution Control Standard (GB16889-2008). The produced water will be discharged to the urban sewage pipe network after reaching the standard.