Cases
POSTION : Home > Cases

Cases

Xinfeng Project

Xinfeng Project

Entry name:Xinfeng County Landfill Leachate Treatment Station

Project location:Yuecheng Landfill Site, Xinfeng County, Shaoguan City, Guangdong Province

Operation mode:Xinfeng County Domestic Waste Landfill Site (Phase I) Leachate Treatment Trustee Operation Xinfeng County Domestic Waste Landfill Leachate Emergency Treatment Operation Project

Technology:Two-stage DTRO treatment process Regulating tank + pretreatment + two-stage A/O + MBR (built-in UF) + nanofiltration (NF) + reverse osmosis (RO)


  • Case description

The first-stage equipment of Xinfeng County Leachate Treatment Station has a daily treatment capacity of 40 tons of filtrate, using two-stage DTRO treatment technology, and the second-stage treatment capacity of daily leachate treatment is 200 tons, using two-stage A/O+MBR (built-in UF)+ Nanofiltration (NF) + reverse osmosis (RO) treatment process, the effluent after leachate treatment meets the discharge concentration limit in Table 2 of the "Pollution Control Standard for Domestic Waste Landfills" (GB 16889-2008).

Label

Qinrunze team