Entry name:Huangshan District Domestic Waste Landfill Leachate Treatment Station
Project location:Xingcun Village, Gantang Town, Huangshan District, Huangshan City, Anhui Province
Operation mode:Trusteeship and operation of leachate treatment station
Technology:Regulating tank + pretreatment + two-stage A/O + MBR + nanofiltration (NF) + reverse osmosis (RO)
The leachate produced in the reservoir area is intercepted by the garbage dam and transported by the pipeline to the adjustment tank of the leachate station. The leachate treatment capacity is 100 tons per day, and the water produced is 70 tons per day; the system recovery rate is 70%. After the leachate is treated, the effluent meets the discharge standard in Table 2 of the "Pollution Control Standard for Domestic Waste Landfill Site" (GB16889-s2008). After the leachate treatment reaches the standard, it is discharged into the nearby water body after online monitoring。
1. Prepared technical solutions;
2. Design process drawings;
3. On-site technical guidance;
4. Research and development of process materials.
1. Prepared electrical design scheme;
2. Wrote application control programs;
3. Design electrical automatic control drawings;
4. Electrical construction wiring debugging.
1. Prepared technical solutions;
2. Design process drawings;
3. On-site technical guidance;
4. Research and development of process materials.
1. Prepared mechanical design scheme;
2. Design 3D manufacturing drawings;
3. Machining drawing, mechanical design;
4. 3D design of site construction.
1. Prepare electrical design scheme
2. Write application control program;
3. Design electrical control drawings;
4. Electrical construction wiring debugging