Cases
POSTION : Home > Cases

Cases

Huangshan Project

Huangshan Project

Entry name:Huangshan District Domestic Waste Landfill Leachate Treatment Station

Project location:Xingcun Village, Gantang Town, Huangshan District, Huangshan City, Anhui Province

Operation mode:Trusteeship and operation of leachate treatment station

Technology:Regulating tank + pretreatment + two-stage A/O + MBR + nanofiltration (NF) + reverse osmosis (RO)


  • Case description

The leachate produced in the reservoir area is intercepted by the garbage dam and transported by the pipeline to the adjustment tank of the leachate station. The leachate treatment capacity is 100 tons per day, and the water produced is 70 tons per day; the system recovery rate is 70%. After the leachate is treated, the effluent meets the discharge standard in Table 2 of the "Pollution Control Standard for Domestic Waste Landfill Site" (GB16889-s2008). After the leachate treatment reaches the standard, it is discharged into the nearby water body after online monitoring。

Label

Qinrunze team