Bei Bai Xiang Project

Bei Bai Xiang Project

Entry name:Beibaixiang Yinyu Village Biochemical Waste Landfill Site

Project location:Yinyu Village, Beibaixiang Town, Yueqing City, Wenzhou City, Zhejiang Province

Operation mode:Equipment purchase contract and operation

Technology:Two-stage dish reverse osmosis (DTRO) pressure filtrate pretreatment


  • Case description

The landfill has been closed. The amount of leachate produced and treated by the pile body has remained at an average of 100 cubic meters per day. The amount of press filtrate entering the site is temporarily uncertain. The produced water is 70 cubic meters, the system recovery rate is 70%, and the produced water meets the discharge standard in Table 2 of the "Landfill Pollution Control Standard for Domestic Waste" (GB16889-s2008). After reaching the standard, the produced water is discharged into the nearby water body.