Entry name:Shaoguan Hualazhai Domestic Garbage Landfill Leachate Treatment Station
Project location:Baichuan Changyin New Energy Co., Ltd. Zhenjiang District, Shaoguan City, Guangdong Province
Operation mode:Managed operation of leachate treatment station
Technology:Adjusting cell + coagulation sedimentation + MBR (two-stage A/O+ built-in MBR) + membrane depth treatment unit (nanofiltration +RO)
The project is located in Zhenjiang District, Shaoguan City, Zhongchang Mountain Huazhai, a total area of 780 acres. The project is divided into three phases, which can be used for 10 years, 10 years and 9 years respectively. Among them, the scale of the first phase of the project is to treat 600 tons of domestic waste per day, and the land area is 480 mu, with an estimated investment of 121 million yuan. The first phase of the project started in March 2006 and was officially commissioned in July 2008. The site is mainly composed of landfill, leachate treatment project, feces harmless treatment and office buildings, roads and ancillary facilities.
Anaerobic sanitary landfill technology is adopted to carry out harmless sanitary landfill for incoming waste. The designed treatment capacity of landfill leachate treatment station is 525 tons/day, which is treated by the process of "regulating tank + coagulation sedimentation + two-stage A/O+MBR+ nanofiltration + reverse osmosis". The effluent water quality meets the national GB16889-2008 "domestic waste landfill pollution control standard" in the secondary discharge requirements for discharge.
1. Prepared technical solutions;
2. Design process drawings;
3. On-site technical guidance;
4. Research and development of process materials.
1. Prepared electrical design scheme;
2. Wrote application control programs;
3. Design electrical automatic control drawings;
4. Electrical construction wiring debugging.
1. Prepared technical solutions;
2. Design process drawings;
3. On-site technical guidance;
4. Research and development of process materials.
1. Prepared mechanical design scheme;
2. Design 3D manufacturing drawings;
3. Machining drawing, mechanical design;
4. 3D design of site construction.
1. Prepare electrical design scheme
2. Write application control program;
3. Design electrical control drawings;
4. Electrical construction wiring debugging