Entry name:Yunyang chadian changling landfill osmotic treatment station
Project location:Changling Road Garbage Landfill, Chadian Town, Yunyang City, Hubei Province
Operation mode:Managed operation of leachate treatment station
Technology:Managed operation of leachate treatment station
Yunyang Chadian Town Changling Road Landfill Project treated 36 tons of leachate and produced 26 tons of water every day. The quality of the produced water met the discharge standard of Table 2 of Domestic Waste Landfill Pollution Control Standard (GB16889-2008). After the treatment of leachate reaches the standard, it is discharged after on-line monitoring.
1. Prepared technical solutions;
2. Design process drawings;
3. On-site technical guidance;
4. Research and development of process materials.
1. Prepared electrical design scheme;
2. Wrote application control programs;
3. Design electrical automatic control drawings;
4. Electrical construction wiring debugging.
1. Prepared technical solutions;
2. Design process drawings;
3. On-site technical guidance;
4. Research and development of process materials.
1. Prepared mechanical design scheme;
2. Design 3D manufacturing drawings;
3. Machining drawing, mechanical design;
4. 3D design of site construction.
1. Prepare electrical design scheme
2. Write application control program;
3. Design electrical control drawings;
4. Electrical construction wiring debugging