Products
POSTION : Home > Products > Environmental protection equipment
Integrated device of dissolved air and air flotation

Integrated device of dissolved air and air flotation

Product overview


1. Large sewage treatment capacity, high efficiency and small footprint.


2, the process and equipment is simple, low cost, easy to manage and maintenance.


3. After debugging, the normal operation of the equipment can achieve automatic and unmanned management state.


4. Effectively reduce the load of biochemical units in sewage treatment process, and play an important role in improving the removal rate of COD and BOD5.


5, for low temperature, low turbidity, algae containing water, the use of air flotation method can achieve better results.


6. It has obvious effect on removing oil, surfactant and odor in the water. At the same time, because aeration increases the dissolved oxygen in the water, it can eliminate sludge bulking and provides favorable conditions for subsequent treatment.


  • Product features
  • Performance

The working principle of


Zhongtong air-flotation treatment method is to waste water air, dissolved air water formation, and precipitation in the form of tiny air bubbles from the water as the carrier, make the emulsified oil, tiny suspended particles and other pollutants in wastewater adhesion on the bubble, with bubbles rise to the surface, by collecting bubble or scum purpose of impurity separation and purification of wastewater.


Range of application


1, petroleum sewage treatment, chemical sewage treatment, printing and dyeing sewage treatment, papermaking sewage treatment, refining sewage treatment.


2, oily sewage treatment, leather sewage treatment, steel sewage treatment, food sewage treatment, starch sewage treatment.


3, slaughtering and breeding sewage treatment, food sewage treatment, painting sewage treatment, washing sewage treatment, coking sewage treatment.


4, bean curd bean powder plus sewage treatment, pickling phosphating sewage treatment and other sewage treatment process.


溶气气浮一体化装置


Type selection reference table

model

processing

(t/h)

Dissolved air water

(t/h)

Equipment power

(kw)

Soluble tank specifications(D×Lmm)

Overall dimensions

(L×B×Hmm)

QRZ-QF5

1~5

1~2

3+0.37

Φ500×1000

3500×1700×2300

QRZ-QF10

5~10

2~3

3+0.37

Φ500×1000

4500×1800×2300

QRZ-QF20

10~20

4~7

5.5+0.37

Φ500×1000

6000×2500×2300

QRZ-QF30

20~30

6~10

5.5+0.37

Φ500×1200

6800×2500×2500

QRZ-QF40

30~40

8~14

5.5+0.37

Φ500×1500

7200×2500×2500

QRZ-QF50

40~50

15~19

7.5+0.37

Φ500×1500

7500×2700×2500

QRZ-QF60

50~60

18~25

7.5+0.37

Φ500×1000

8500×2700×2900

QRZ-QF70

60~70

20~27

7.5+0.37

Φ500×1800

9000×2700×2500

QRZ-QF80

70~80

24~32

11+0.37

Φ600×1800

9300×2800×2500

QRZ-QF90

80~90

30~35

15+0.37

Φ600×2000

10000×3000×2800

image.png



Performance distribution

  • 01

    Northwest, North China and Northeast China

    (Xinjiang, Inner Mongolia, Heilongjiang, Hebei, Shaanxi, Ningxia, Shanxi)

    There are 15 installation projects, 5 operation 

    projects and more than 40 other projects

  • 02

    Central and southwest China

    (Beijing, Henan, Hubei, Yunnan, Guizhou, Yunnan, Jiangxi)

    16 installation projects, engineering and operation projects

    8 items and nearly 60 items


  • 03

    Northwest, North China and Northeast China

    (Xinjiang, Inner Mongolia, Heilongjiang, Hebei, Shaanxi, Ningxia, Shanxi)

    There are 15 installation projects, 5 operation 

    projects and more than 40 other projects

  • 04

    Central and southwest China

    (Beijing, Henan, Hubei, Yunnan, Guizhou, Yunnan, Jiangxi)

    16 installation projects, engineering and operation projects

    8 items and nearly 60 items


  • 01

    Northwest, North China and Northeast China

    (Xinjiang, Inner Mongolia, Heilongjiang, Hebei, Shaanxi, Ningxia, Shanxi)

    There are 15 installation projects, 5 operation 

    projects and more than 40 other projects

  • 02

    Central and southwest China

    (Beijing, Henan, Hubei, Yunnan, Guizhou, Yunnan, Jiangxi)

    16 installation projects, engineering and operation projects

    8 items and nearly 60 items


  • 03

    Northwest, North China and Northeast China

    (Xinjiang, Inner Mongolia, Heilongjiang, Hebei, Shaanxi, Ningxia, Shanxi)

    There are 15 installation projects, 5 operation 

    projects and more than 40 other projects

  • 04

    Central and southwest China

    (Beijing, Henan, Hubei, Yunnan, Guizhou, Yunnan, Jiangxi)

    16 installation projects, engineering and operation projects

    8 items and nearly 60 items


  • Label