News
POSTION : Home > News > Company news

DTRO leachate equipment routine work inspection system

2021-01-29 09:42:43

The routine work inspection system of DTRO leachate equipment includes:


1. Patrol inspection is an important part of the daily work of sewage treatment personnel. It is an effective means to prevent abnormal situations in the operation process and to correctly judge and eliminate the causes of abnormal situations


2. In the testing process, it is necessary to be familiar with the testing standards of DTRO leachate equipment, grasp the operation changes of DTRO leachate treatment equipment, understand the natural environmental factors, timely find abnormal conditions for analysis and report, and take measures to eliminate hidden dangers.


3. Formulate reasonable inspection routes according to the actual situation of each project.


4. Perform inspection of related equipment and instruments, to carefully observe, diligent, really see what you see. Keep records and make sure the warning signs are good and clean

DTRO渗滤液设备

5. Sewage treatment personnel should check every two hours, 15 minutes before and after every hour.


6. The inspection time of different shifts shall be executed according to the specified time.


7. Major problems arising during the inspection, which cannot be solved by themselves, must be reported to relevant departments or leaders as soon as possible. After the handler switch is complete, you can leave the scene and record the scene in detail.


8. If there is any abnormal situation, we should follow up and observe in time, make detailed records, and explain to the next class to avoid causing major accidents.


9. After inspection, fill in the operating parameter table of the leachate treatment station, and fill in the defect list in time if equipment defects are found.


10. When recording the operating parameter table of the leachate treatment station, it should be true, accurate and clear, and keep the record book clean and tidy.



Label